Body
Thursday and Friday were the days for which San Gabri- spring’s rainfall. Several blocks in the northern part of San el Street residents have been waiting. The street was paved Gabriel had severely deteriorated. Drainage work preceded those days after months of work which were delayed by this the paving. For a “before-and-after” see page 3A.
- Log in or Subscribe to post comments.
